Airport Terminal Case Studies
- Validating design for future development
- Operational Readiness Activation and Transition (ORAT)
- Departures and arrival baggage capacity assessment
- Check-in to gate E2E capacity assessment with dynamic simulation
- Complete level 3 independent demand and capacity declaration assessment
- End to End Airport Capacity Assessment in collaboration with NATS covering Kerbside to Airspace.
- Full holistic baggage and check-in operational requirements analysis of the three airports.
- Whole airport terminal capacity assessment, utlising the existing terminal footprint.
- Successfully undertook a capacity and feasibility assessment for St Pancras terminal, Eurostar.
- Using simulations to quantify the benefit of constructing two PRM lifts in their terminal.
- Provided input in multiple areas with finding solutions to improve capacity and efficiency.
- Simulations and project management to move all airlines to the new Integrated Baggage System