• Provided input in multiple areas with finding solutions to improve capacity and efficiency.
Image Sourced: By Sweett Group
  • Simulations and project management to move all airlines to the new Integrated Baggage System
Heathrow T5 Checkin
  • Analysis and simulations in preparation for new Hold Baggage Screening (HBS) standards.
  • Programme management and process development of all terminals, modelling and finding solutions.
  • Improving facilities and capacity through newer automated check in technologies.
  • Simulating and reporting on passenger flows, demographics and resource utilisation for retail outlets.
  • Managing the tender process for a new baggage system through to a successful conclusion.
  • Validating and assessing the effect of Early Bag Stores and Bag Drops using 2½ and 3D simulations.
Heathrow Airport Trolley Analysis
  • Analysis of baggage trolley movements to understand demand and space if capacity was increased
  • Undertaking a capacity assessment to augment capacity utilising the existing terminal footprint.
Heathrow Inter Terminal Coach
  • Modelling fluctuations and variations of activity at Heathrow to preview changes before they happen.
T2 thumbnail
  • Determine and develop airside traffic simulation