Taking AiQ’s Knowledge of Airport Capacity Management to a Wider Audience

Airport Capacity Training Course

Alongside Richard Chapman of ADC (Airport Design Consult), Director of AIQ Consulting, Adrian Todd , undertook a training course in Kuala Lumpur in October 2016 offering practical advice, guidance and support to Airport Senior Managers, Airport Consultants and Airport Capacity Analysts involved in capacity planning and operational efficiency within the airport industry. Read More »

Talent is the Key to our Success

The ability of our team, and how we work together effectively, has long been part of AiQ’s strategy. Our people are one of the most important aspects of AiQ and we take them, and their training, seriously.

“Part of the AiQ vision was to have the best people quickly and easily solving the most complex problems; and presenting solutions in a simple and cost effective ways.” Adrian Todd, Director .

Read More »

Meet our Team – Graduate Airport Planner – Mevin Varghese

mevin-sized-final

A welcome return to our series of Meet the Team Q&As with Mevin Varghese, our Graduate Airport Planner. Mevin is an experienced Architect with a background in terminal planning and architecture and his role at AiQ involves technical capacity planning and assessing process models and solutions.

What is a typical day like at AiQ?

Read More »

New Contracts for Autumn 2016

19085258132_fb27b4793d_z

AiQ Consulting are proud to announce three new contracts for Autumn 2016.

Heathrow Terminal 5

AiQ are providing support for the ECAC Std 3 HBS Replacement Program at Heathrow Terminal 5 for MACE. For this mandatory security upgrade requirement for 2018, we have been awarded the contract to Benchmark the Performance and Functionality of the HBS System, prior to replacement of 29 HBS machines. Further, AiQ are undertaking Capacity and Performance assessments, on an ongoing basis, which in turn inform the replacement Mitigation Phasing Plans, to assure Stakeholders that performance will not be degraded during and after the assets are replaced.

Read More »

India’s New Aviation Policy – Encouraging Growth for the Market

India

India’s new Aviation Policy came into force in June 2016, following a considered and successful consultation period.

With India as the world’s fastest-growing aviation market, and expected to become the third largest aviation market in the world before 2025, the new policy reflects that position and enables the country to work towards accelerating growth.

The Indian Government first released their draft policy in 2014, making revisions and gaining feedback from stakeholders throughout the two-year period to produce a well thought-out and integrated policy to encourage the development of the Indian Aviation market.

The vision is to make flying affordable for the masses. The Indian Government also aims to enable: Read More »

AiQ’s Olympic Legacy

London 2012

With more than 10,000 athletes staying at the village of 31 apartment blocks close to the Olympic Park during the Rio Olympic Games, there must be a fair amount of logistical problems for officials to face. Although the media doesn’t always hear about them, especially if everything goes to plan and there are no disasters, there will always be thousands of people working hard behind the scenes to make such a massive event possible.

This is something that AiQ Consulting has a lot of experience in! During the London 2012 Games, we worked with various contractors and clients to organise the Pop-Up terminal at Heathrow for the thousands of athletes arriving and departing London before and after the Games.

Read More »

White Paper – New Ways of Thinking

Is Your Baggage Handling System holding You Back?

Over the last decade global passenger numbers have grown considerably putting immense pressure on the industry’s baggage systems; and passenger numbers are only set to rise.

So what does this mean for airports and airlines? Read More »

How can regional airports define optimum success?

Airport4

For small regional airports, reaching the optimum passenger Levels of Service (LoS) can be hard to achieve. Without the large support network, stakeholders and suppliers that a hub airport possesses, regional airports may find it difficult to know how large their check in area should be, whether their passengers are travelling through departures in an acceptable amount of time, and if their arrivals procedure is up to scratch. Read More »

Working in Partnership at Airports Worldwide

There is long history of suppliers and contractors working in partnership to generate the best results for clients. Airports, and the aviation industry as a whole, rely on different companies working together strategically to achieve their aims. While we can offer expertise in airport capacity planning, baggage systems, data modeling and stakeholder engagement, AiQ collaborate with teams of other contactors, such as airport design consultants, project managers and baggage design consultants, all contributing their own relevant specialisms. Read More »

Defining the optimum level of service for airports worldwide

Thumnail-T-2-(v2)

AiQ Consulting’s new IATA Modelling Tool provides airports with a new and efficient way of assessing their current and future infrastructure and operational needs based on the passenger level of service (LoS) requirements as outlined in the Airport Development Reference Manual 10th Edition (ADRM). The ADRM, published by IATA, has defined excellence in airport design for millions of passengers worldwide for over 40 years. Read More »

Improving the efficiency of airport Check-In with new technologies

Airport4

Improving the efficiency of Airport Check-In is a key concern for our clients. Not only affecting and improving passenger experience, introducing new technologies at Check-In can also reduce capacity issues and increase time spent at retail and F&B outlets for passengers. This is a valuable advantage for any airport wishing to grow profits. Read More »